A hangar project is delivered faster and with fewer surprises when each stage has clear gates, responsibilities, and deliverables.
01
5 stages
delivery framework
from concept to handover
02
30-90 days
typical build window
steel-frame format
03
10-15%
reserve
recommended contingency level
04
24h
pre-estimate
for initial feasibility check
Stage 1: Pre-design and scope definition
- define functional purpose and dimensions,
- validate site constraints and utility context,
- prepare preliminary budget corridor.
Stage 2: Engineering and approvals
- structural and envelope design,
- foundation concept based on geotechnical input,
- fire safety and technical documentation package.
Stage 3: Manufacturing and procurement
- steel fabrication and quality control,
- procurement of envelope and engineering components,
- logistics and site-readiness synchronization.
Stage 4: Construction and assembly
- foundation works,
- steel frame erection,
- enclosure and engineering installation.
Stage 5: Testing and commissioning
- system checks and corrections,
- compliance verification,
- final handover to operations.
Need a stage-by-stage schedule?
We can prepare a practical timeline and milestone map tailored to your hangar size and site conditions.
Ключевой вывод
Most schedule and budget risks are prevented before construction starts: clear scope, validated utilities, and disciplined stage control are the core success factors.