Hangar Construction Stages: From Concept to Commissioning

StroyHubJanuary 12, 20267 min read
Hangar Construction Stages: From Concept to Commissioning

A hangar project is delivered faster and with fewer surprises when each stage has clear gates, responsibilities, and deliverables.

01

5 stages

delivery framework

from concept to handover

02

30-90 days

typical build window

steel-frame format

03

10-15%

reserve

recommended contingency level

04

24h

pre-estimate

for initial feasibility check

Stage 1: Pre-design and scope definition

  • define functional purpose and dimensions,
  • validate site constraints and utility context,
  • prepare preliminary budget corridor.

Stage 2: Engineering and approvals

  • structural and envelope design,
  • foundation concept based on geotechnical input,
  • fire safety and technical documentation package.

Stage 3: Manufacturing and procurement

  • steel fabrication and quality control,
  • procurement of envelope and engineering components,
  • logistics and site-readiness synchronization.

Stage 4: Construction and assembly

  • foundation works,
  • steel frame erection,
  • enclosure and engineering installation.

Stage 5: Testing and commissioning

  • system checks and corrections,
  • compliance verification,
  • final handover to operations.

Need a stage-by-stage schedule?

We can prepare a practical timeline and milestone map tailored to your hangar size and site conditions.

Get schedule
Ключевой вывод
Most schedule and budget risks are prevented before construction starts: clear scope, validated utilities, and disciplined stage control are the core success factors.