The roof is one of the most heavily loaded structures on a warehouse in Almaty. Snow loads (zone V–VI), seismic activity, temperature swings from -25°C in winter to +38°C in summer — all of this affects the choice of material. A roofing mistake means leaks, insulation loss, and costly repairs in 3–5 years. Let's look at the options with hard numbers.

01

V–VI

Almaty snow load zone

normative snow load 1.5–2.0 kPa — higher than Astana (II–III) and especially Shymkent (I–II)

02

8,000–12,000 ₸/m²

100 mm roofing sandwich panels

PIR core, steel profile, with installation — warm roof for a heated warehouse

03

3,000–5,000 ₸/m²

0.65 mm corrugated sheet with installation

cold roof for unheated sheds — without insulation, basic option

04

15 years

PVC membrane warranty period

flat roof — more expensive, but seamless and long-lasting when correctly installed

Snow Load in Almaty: Why the Roof Must Be Stronger

Almaty falls in snow load zone V–VI under the SNiP RK standard (one of the most heavily loaded). Normative snow load:

  • Zone V: 1.5 kPa = 150 kg/m²
  • Zone VI (mountain areas): 2.0 kPa = 200 kg/m²

Compare: Shymkent — Zone I (0.5 kPa), Astana — Zones II–III (0.7–1.0 kPa).

This means roof structures in Almaty are designed for significantly greater loads. A typical Almaty roof frame is 25–40% heavier than an Astana one.

Snow + seismics = double requirements

Almaty is the only major city in Kazakhstan where high snow loads (zones V–VI) and high seismicity (8–9 points) occur simultaneously. Roof structures are designed for the combination of both loads per **SP RK 2.03-30-2017**.

Option 1: Roofing Sandwich Panels

The most common option for warm warehouses. The panel consists of two steel sheets and insulation (PIR or mineral wool).

Typical specifications for Almaty:

  • Thickness: 100–150 mm (PIR core λ=0.022 W/m·K)
  • Length: up to 12–14 m (standard) or up to 24 m (welded)
  • Sheet coating: PVDF or Polyester (resistant to mountain UV radiation)
  • Load: calculated per snow zone requirements
ThicknessApplication in AlmatyCost with installation
80 mmWarm building, mild climate — insufficient for Almaty
100 mmWarm warehouse, +15°C inside8,000–12,000 ₸/m²
150 mmEnhanced thermal requirements, energy efficiency11,000–15,000 ₸/m²
200 mmCold storage warehouse, technical facilities14,000–19,000 ₸/m²

Pros:

  • Insulation + waterproofing + finish in one element
  • Fast installation
  • Good snow load capacity with proper purlin spacing

Cons:

  • Condensation at joints with improper installation
  • If one panel is damaged — replacement is needed

Option 2: Corrugated Sheet (Cold Roof)

For unheated warehouses, sheds, and utility buildings — profiled sheet without insulation.

Sheet thicknessApplicationCost with installation
0.5 mmLight structures — not recommended for Almaty snow zone V
0.65 mmStandard for sheds and temporary structures3,000–5,000 ₸/m²
0.7–0.8 mmHeavy-duty, for industrial facilities4,500–6,500 ₸/m²

For Almaty snow zone V: purlin spacing must be calculated for the normative load — the standard 1.5 m spacing used in many other regions is reduced to 1.2 m here.

Option 3: Flat Roof with PVC Membrane

For multi-storey production buildings, technical platforms with rooftop equipment (air conditioners, ventilation), or when an accessible roof is needed.

Composition of the flat roof "layer cake":

  1. Load-bearing corrugated sheet (base)
  2. Vapour barrier
  3. Thermal insulation (PIR or EPS) — 150–200 mm for Almaty
  4. PVC membrane 1.5–2 mm with mechanical fixation
ParameterValue
Membrane service life15–25 years with proper installation
Cost of layer cake with installation12,000–20,000 ₸/m²
Slope (minimum)1.5–2% for drainage
Plus seismicsMechanical fasteners with anti-seismic calculation

Drawback for Almaty: a flat roof accumulates snow. In snow zone V–VI, a carefully designed drainage system and parapets are required to prevent snow pockets.

Ventilated Roofs for Cold Sheds

For unheated sheds (agricultural machinery storage, transit warehouses), a ventilated roof is used: corrugated sheet + air gap + mineral wool, or corrugated sheet without insulation. The main goal is to prevent condensation on the inside.

Comparison Table: Choosing for Almaty

CriterionSandwich panelsCorrugated sheet (cold)PVC membrane
Warm warehouse✅ (with insulation)
Cold shed
Snow load (zones V–VI)Requires purlin spacing calculation
Service life20–25 years15–20 years15–25 years
Cost (warm)8,000–15,000 ₸/m²n/a12,000–20,000 ₸/m²
Cost (cold)n/a3,000–6,500 ₸/m²n/a
Leak riskLow (with correct installation)Medium (joints)Low (monolithic)

We'll calculate the roof structures for your warehouse accounting for Almaty snow loads

StroyHub designs roofing with calculations for snow zone V–VI and 9-point seismics — get an estimate within 24 hours.

Get a roof calculation
Ключевой вывод
Warehouse roofing in Almaty operates under harsh conditions: snow zone V–VI (150–200 kg/m²) + 9-point seismics. For a warm warehouse — PIR sandwich panels 100–150 mm (8,000–15,000 ₸/m²). For a cold shed — corrugated sheet 0.65–0.8 mm with reduced purlin spacing (3,000–6,500 ₸/m²). Flat roof with PVC membrane — for facilities with rooftop equipment (12,000–20,000 ₸/m²). The right choice provides protection from leaks and repairs for 15–20 years.

Need a consultation?