Back to Blog
warehouse maintenance Almatymetal structure carewarehouse servicinganti-corrosion protection

Maintenance of Metal Structure Warehouses in Almaty: Annual Checklist

StroyHubJanuary 24, 20266 min read
Maintenance of Metal Structure Warehouses in Almaty: Annual Checklist

Metal structures do not maintain themselves. Without regular maintenance, a building's service life shrinks from 30–40 years to 15–20. In Almaty, specific factors add to the challenge: seismic events (even small 4–5-point ones) require a post-earthquake inspection, and the mountain climate accelerates corrosion at joints. Let's look at what to check and when.

01

once a year

scheduled technical inspection

visual inspection of load-bearing structures, roof, facade, gates — minimum frequency

02

after 5+ points

unscheduled inspection after an earthquake

Almaty: even small seismic events can disturb structural junction nodes

03

every 5 years

anti-corrosion coating renewal

under normal operating conditions — more often in aggressive environments (chemical warehouse)

04

up to 5% of value

annual maintenance cost as % of building value

planned maintenance expenses — without maintenance, repairs cost 3–5 times more

Why Maintenance Is Critical Specifically in Almaty

Several factors make maintenance in Almaty more important than in other regions of Kazakhstan:

1. Seismicity Almaty experiences micro-seismic events regularly. Tremors of 3–5 points, which a person feels as light vibration, can loosen bolted connections or cause hairline cracks in welds. This is not always visible to the naked eye.

2. Temperature Swings From −25°C in winter to +38°C in summer — metal expands and contracts annually. After 5–7 years without maintenance, sandwich panel joints and roof flashings begin to let in moisture.

3. Mountain Environment UV radiation in Almaty is above the lowland average. Standard polyester (PE) coating loses its protective properties faster than in other regions. PVDF coating is significantly more durable.

Annual Maintenance Checklist

Monthly

  • Visual inspection of the roof for signs of leaks (stains on the ceiling inside)
  • Check gate and side door operation (play, closing force)
  • Inspect condition of drainpipes and gutters (especially in autumn-winter)
  • Clear snow from the roof when accumulation exceeds 20–30 cm (zone V–VI snow load)

Annually (in spring, after winter)

Roof:

  • Inspect roofing panels — dents, cracks, shifts
  • Check roof flashings at walls, parapets, ventilation outlets
  • Clean gutters of leaves and debris
  • Check condition of seals in panel joints

Walls and facade:

  • Inspect wall sandwich panels for damage
  • Check silicone seals at corner joints
  • Inspect paint and coating condition (fading, rust at joints)

Load-bearing structures:

  • Visual inspection of columns, trusses, purlins for corrosion
  • Check bolted connections (re-torque any loosened ones found)
  • Inspect anti-corrosion coating at points of mechanical damage

Foundation and ground junction:

  • Inspect the apron (cracks, settlement)
  • Check drainage channels

Gates and doors:

  • Lubricate hinges, rollers, springs
  • Adjust horizontal level of sectional gates
  • Check operation of locks, latches, and seals

After an Earthquake (5+ points)

  • Immediate visual inspection of load-bearing structures
  • Check bolted connections for signs of displacement
  • Inspect foundation for cracks
  • If damage found — call in an engineer for a technical assessment

Earthquake 5+ points — mandatory inspection

After any seismic event of intensity 5 points or above, do not use the building intensively without an inspection. Damage to load-bearing structures that is not visible to the eye can lead to failure during the next event.

Every 5 Years: Renewal of Anti-Corrosion Protection

Metal structures in Almaty are coated with an anti-corrosion system during construction. Service life:

  • Alkyd primer + enamel: 5–7 years (under normal conditions)
  • Epoxy primer + polyurethane topcoat: 8–12 years
  • Zinc-rich systems (hot-dip galvanising): 20–30 years

Coating renewal procedure:

  1. Surface preparation (sandblasting or mechanical)
  2. Weld inspection, re-welding if necessary
  3. Application of primer and topcoat

Cost of coating renewal for a 1,000 m² warehouse (frame only): 1,500,000–4,000,000 ₸.

Annual Maintenance Costs

Type of workFrequencyCost for a 1,000 m² warehouse
Scheduled technical inspectionOnce a year50,000–150,000 ₸
Minor repairs (seals, bolts)Once a year100,000–400,000 ₸
Gate servicing (2–4 units)Twice a year80,000–200,000 ₸
Gutter and roof cleaningTwice a year50,000–150,000 ₸
Post-earthquake technical surveyAs needed150,000–500,000 ₸
Total per year (excl. anti-corrosion)280,000–900,000 ₸/year

That is 0.2–0.6% of the building's value per year — a reasonable investment compared to the cost of repairs after neglect, which runs to 10–30 million tenge.

StroyHub provides maintenance services for completed facilities in Almaty

We service warehouses and industrial buildings — scheduled inspections, post-seismic surveys, anti-corrosion renewal.

Request Maintenance
Ключевой вывод
Warehouse maintenance in Almaty: annual inspection of roof, walls, and load-bearing structures — 280,000–900,000 ₸/year. Post-earthquake inspection after 5+ point events is mandatory. Anti-corrosion coating renewal every 5–8 years — 1.5–4 million ₸ for a 1,000 m² facility. Without regular maintenance, service life of metal structures is cut in half.