Prices for steel structures in Kazakhstan rose 10–15% in 2026 compared to 2024. The main drivers: higher steel rolled products on global markets, rising logistics costs, and strong construction demand in the region. Here are the current benchmarks.
from 480,000 ₸/t
steel structures
ex-factory in Kazakhstan
+10–15%
year-on-year price growth
vs 2024 levels
220–260 $/t
hot-rolled steel
base raw material on the KZ market
30–40%
labour in total cost
fabrication and installation
Steel Structure$2 Prices in 2026
Factory-Made Structures (delivered across Kazakhstan)
| Structure Type | Price per tonne (VAT included) |
|---|---|
| Columns, beams (hot-rolled) | from 480,000–550,000 ₸/t |
| Welded trusses | from 520,000–620,000 ₸/t |
| LSTS (light gauge steel) | from 420,000–480,000 ₸/t |
| Purlins, bracing | from 440,000–500,000 ₸/t |
| Galvanised structures | from 650,000–750,000 ₸/t |
Steel Structure Installation
| Installation Volume | Installation Cost (structures excluded) |
|---|---|
| up to 20 t | from 160,000–200,000 ₸/t |
| 20–100 t | from 120,000–160,000 ₸/t |
| over 100 t | from 80,000–120,000 ₸/t |
Cladding (Roof and Walls)
| Material | Price per m² (installed) |
|---|---|
| Roof profiled sheet H60 | from 3,500–4,500 ₸/m² |
| Roof sandwich panel 100 mm | from 9,000–12,000 ₸/m² |
| Wall sandwich panel 100 mm | from 8,000–11,000 ₸/m² |
| Wall sandwich panel 150 mm | from 10,000–14,000 ₸/m² |
What Affects Structure Costs
Region. Almaty and Astana — lower transport costs. Pavlodar and Temirtau — closer to steel mills. Western regions — delivery adds 5–8%.
Structural complexity. Non-standard joints, shaped elements, brackets — a 15–30% surcharge over standard structure prices.
Order volume. Orders of 100 t or more get an 8–12% discount versus small batches.
Lead time. Rush orders (under 3 weeks) — a 10–20% surcharge.
Corrosion protection. Hot-dip galvanising costs 25–35% more than primer-paint, but lasts 3–4 times longer.
How to Optimise the Budget
- Standardise cross-sections — fewer section sizes → cheaper production.
- Use standard spans (18 or 24 m) — they've been optimised and are well-priced.
- Order off-season (November–January) — factories have spare capacity, discounts are real.
- Bundle structures and installation with one contractor — saves 10–15% on coordination.