Hangar construction$2 prices in Kazakhstan in 2026 have risen 12–18% compared to 2024–2025 due to higher steel and building material costs. Below are current benchmarks — broken down by structure type and specification.
from 23,000 ₸/m²
unheated hangar
frame + profiled sheet, without foundation
from 70,000 ₸/m²
heated hangar
100 mm sandwich, turnkey
+12–18%
price growth year-on-year
vs 2024 level
15–20%
foundation
share of total cost
Hangar Cost by Area and Type — 2026
Unheated Hangar (Frame + Profiled Sheet)
| Area | Structures only | Turnkey with foundation |
|---|---|---|
| 300 m² | from 4.5 million ₸ | from 7 million ₸ |
| 500 m² | from 7 million ₸ | from 11 million ₸ |
| 1,000 m² | from 13 million ₸ | from 20 million ₸ |
| 2,000 m² | from 24 million ₸ | from 38 million ₸ |
Heated Hangar (Frame + 100 mm Sandwich)
| Area | Structures only | Turnkey with foundation |
|---|---|---|
| 300 m² | from 13 million ₸ | from 20 million ₸ |
| 500 m² | from 21 million ₸ | from 32 million ₸ |
| 1,000 m² | from 42 million ₸ | from 65 million ₸ |
| 2,000 m² | from 80 million ₸ | from 120 million ₸ |
What Is Included in the Turnkey Price
- Design (adaptation of standard solution);
- Foundation (strip foundation on standard soil);
- Steel frame (columns, trusses, purlins);
- Roofing and wall cladding;
- Gates (1–2 sections);
- Turnkey installation.
Typically not included:
- Engineering systems (electrical, heating, ventilation, water supply);
- Floors (concrete screed);
- Internal partitions;
- Geological surveys;
- Permitting documentation.
What Affects the Price Most
Wall height. Each metre of wall height above the standard 6 m adds 8–12% to the frame cost.
Span. A 24 m span hangar is 15–25% more expensive than an 18 m span at the same area.
Region. Almaty is the base price. Delivery to other regions adds 3–8% to structure costs.
Seismicity. In Almaty and seismically hazardous areas, frame reinforcement adds 10–15%.
Timeline. Rush orders (less than 3 weeks) — 10–20% surcharge.
How to Save Without Compromising Quality
- Choose a standard span (18 or 21 m) instead of a custom one;
- Simplify the gate and opening layout;
- Order structures and installation from one company (no middleman);
- Plan construction outside the seasonal peak (November–February).