Top Mistakes in Warehouse Construction Projects

StroyHubJanuary 5, 20267 min read
Top Mistakes in Warehouse Construction Projects

Most project overruns are not caused by one large failure. They usually result from several preventable decisions made too early or too late.

01

10-15%

recommended reserve

for contingencies

02

5 common errors

high-impact risks

cost and timeline drivers

03

2-4 months

possible delay

if utilities are ignored early

04

up to 30%

overrun potential

without proper pre-design stage

1) Skipping geotechnical survey

Without proper soil data, foundation choice becomes guesswork and often leads to expensive redesign.

2) Underestimating utility connections

External networks, permits, and capacity constraints can become the longest path in the schedule.

3) Poorly defined operational requirements

If dock strategy, equipment flow, and storage logic are unclear, design revisions become inevitable.

4) Selecting envelope by price only

Lowest capex envelope can increase lifecycle costs through heat loss, condensation, and maintenance burden.

5) No contingency planning

Projects without reserve budgets and milestone buffers are structurally fragile.

Risk management baseline

Fix scope early, run geotechnical and utility checks up front, and keep a contingency reserve with a realistic schedule buffer.

Need a pre-project risk review?

We can review your concept and identify key timeline and budget risks before construction starts.